Incident Number,Date (dd.mm.yy),Time start (hh:mm:ss),Time end (hh:mm:ss),Total Time (hh:mm:ss),FACE Array,Description,Data deleted from summary stats (Yes/No),, 1,04.04.17,10:08,12:02:13,01:54:13,1,"Kurz valve, plot 1 failed - sticking and not responding to signal. Occurred between 10:00-13:00",No,, 2,07.04.17,04:53,19:32:58,14.67,1,base gas concentration fluctuation through day between 350.3ppm and 443.4ppm resulting in fluctuation in FACE grab values,No,, 3,11.04.17,04:43,07:07:00,02:24:00,1,"Campbell Data logger stopped communicating with FACE, Fumigation delayed.",No,, 4,11.04.17,07:08,04:47:00,02:21:00,4,"Campbell Data logger stopped communicating with FACE, Fumigation delayed.",No,, 5,11.04.17,07:34:09,04:51:03,02:43:06,6,"Campbell Data logger stopped communicating with FACE, Fumigation delayed.",No,, 6,11.04.17,14:53:25,15:33:27,00:40:27,1,Plant tripped w/ tanker filling. Fumigation failed. Sysyem checked and re-instated,No,, 7,11.04.17,14:55:04,15:34:06,00:39:02,4,Plant tripped w/ tanker filling. Fumigation failed. Sysyem checked and re-instated,No,, 8,11.04.17,14:56:11,15:36:12,00:40:01,6,Plant tripped w/ tanker filling. Fumigation failed. Sysyem checked and re-instated,No,, 9,25.04.17,04:14,07:39:00,03:25:00,4,FACE system delayed due to temperature parameter,No,, 10,25.04.17,04:17,08:47:00,04:30:00,6,FACE system delayed due to temperature parameter,No,, 11,30.04.17,05:58,16:45:20,10:47:20,1,High winds and varying wind direction - Proportional valve alarm through listed times,No,, 12,30.04.17,09:43,14:37:15,04:54:15,4,High winds and varying wind direction - Proportional valve alarm through listed times,No,, 13,30.04.17,na,na,na,6,High winds and varying wind direction - No Proportional valve alarm as in Arrays 1 and 4,No,, 14,04.05.17,06:03,11:23:29,05:20:29,1,Bad PV response - changed Kurz valve and all OK,No,, 15,03.06.17,11:08,19:12:25,08:04:25,1,CO2 plant tripped,No,, 16,03.06.17,11:08,19:12:25,08:04:25,4,CO2 plant tripped,No,, 17,03.06.17,11:07:37,19:13:02,08:05:25,6,CO2 plant tripped,No,, 18,12.06.17,09:02:01,09:36:01,00:34:00,1,Changing PTFE seals in pressure reduction station 1,No,, 19,14.06.17,09:05:03,09:38:03,00:33:00,6,Engineering shutdown to replace valve,No,, 20,26.06.17,03:06:04,07:09:57,04:03:54,1,"Power outage - plant tripped, system manually restarted ",No,, 21,26.06.17,03:06:01,07:09:17,04:03:16,4,"Power outage - plant tripped, system manually restarted",No,, 22,26.06.17,03:06:01,07:09:17,04:03:16,6,"Power outage - plant tripped, system manually restarted ",No,, 23,11.07.17,13:37:02,13:50:04,00:13:02,1,Evaporator B tripped plant and fumigation failed.,No,, 24,11.07.17,13:37:01,13:51:02,00:14:01,4,Evaporator B tripped plant and fumigation failed. ,No,, 25,11.07.17,13:36:15,13:50:16,00:14:01,6,Evaporator B tripped plant and fumigation failed. ,No,, 26,21.07.17,04:14:00,20:16:03,16:02:13,1,South/SE winds gusting - Kurz valve maxed out at 2000 kg/h and still under-dosing.,No,, 27,25.07.17,07:05:07,12:06:26,05:01:19,1,Planned works to add power to Flux Tower Lab from. Power source through Array 1 therefore fumigation = off,No,, 28,06.08.17,08:32:00,12:48:16,04:16:16,1,Plant shutdown due to supplier CO2 shortage ,No,, 29,06.08.17,08:32:14,12:47:29,04:15:15,4,Plant shutdown due to supplier CO2 shortage ,No,, 30,06.08.17,08:32:07,12:45:34,04:13:24,6,Plant shutdown due to supplier CO2 shortage ,No,, 31,07.08.17,10:57:18,19:48:44,08:49:26,1,Plant shutdown due to supplier CO2 shortage ,No,, 32,07.08.17,10:57:47,19:45:13,08:47:26,4,Plant shutdown due to supplier CO2 shortage ,No,, 33,07.08.17,10:55:34,19:41:43,08:46:09,6,Plant shutdown due to supplier CO2 shortage ,No,, 34,08.08.17,04:41:17,09:24:34,04:43:17,1,System under delayed start due to low level CO2 in storage vessels. ,No,, 35,08.08.17,04:45:17,09:22:33,04:37:16,4,System under delayed start due to low level CO2 in storage vessels. ,No,, 36,08.08.17,04:49:11,09:24:22,04:35:11,6,System under delayed start due to low level CO2 in storage vessels. ,No,, 37,16.08.17,05:21:01,07:22:08,02:01:07,1,Kurz valve stuck and not repsonding. System depressurised at reducing station and valve adjusted and repressurised.,No,, 38,26.08.17,05:20,09:23:09,04:03:09,1,Proportional valve malfunction at 05:30. No flow though Kurz valve between 05:30 and 13:25. Restarted PC and FCP1. at 13:24. ,No,, 39,27.08.17,05:38:00,19:07:12,13:39:12,1,Proportional valve malfunction at 05:30. No flow though Kurz valve between 05:38 and 19:07:12. Valve failure,No,, 40,28.08.17,05:28:34,19:05:10,13:46:36,1,Proportional valve malfunction at 05:30. No flow though Kurz valve between 05:28:34 and 19:05:19. Valve failure,No,, 41,24.09.17,15:33:03,15:44:03,00:11:00,1,Gas alarm. High gas concentration in Array due to change of wind direction and low speed resulting in highly elevated CO2 conditions,No,, 42,24.09.17,16:09:01,17:54:06,01:45:03,6,IRGA failure resulting in unstable readings (>3000ppm),Yes,, 43,25.09.17,06:08:21,08:59:29,02:51:08,6,IRGA failure resulting in unstable readings (>3000ppm). IRGA changed,Yes,, 44,06.10.17,06:21:00,06:55:01,00:34:01,6,proportional valve alarm. Kurz valve not responding to demand therefore underdosing,No,, 45,16.10.17,06:39:23,17:09:05,10:29:42,1,Sustained high winds and gusting winds resulting in underdosing of array,No,, 46,16.10.17,06:39:23,17:09:44,10:30:21,6,Sustained high winds and gusting winds resulting in underdosing of array,No,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,,